311Cast-in-placeElectrical and plumbing
Cast-in-Place 2-Tiered Trapeze
Two-tiered cast-in-place trapeze: double crossbars 3 in. apart secure any size pipe or conduit.

In use.
Function
Pre-pour
Temporary securement device: positions and secures the utility before and during the concrete pour.
No rating
No load rating is published; the cured concrete carries the utility.
The cured concrete carries the utility.
Order
Order the part
Add parts to your list, then request a quote, a submittal package, or both. Pricing follows by reply.
Built to order
Height, in.
Width, in.
Your part number
311A__B__
Finish the selections to complete the request.
From the data sheet
Notes
- Two-tiered cast-in-place trapeze: double crossbars 3 in. apart secure any size pipe or conduit.
- Angled feet conceal the support when the forms are removed.
- Galvanized rod; corrosion resistant.
- Rigid support: stable pipe and conduit positioning during the pour.
- Designed for demanding high-rise construction.
- Electrical and plumbing: positions PVC conduit, PVC-coated GRC, ENT and PVC- jacketed MC (NEC 352.30, 344.30, 362.30, 330.30) and sleeved PEX (IPC 305, UPC 312.2) in the pour, secured so they cannot float, shift or separate at joints; spacing per the specifications and the manufacturer.
- Drawings not to scale.