Slab-on-Grade Slick Rod Support

Slab-on-grade slick rod support with an integrated loop: secures the pipe prior to rebar.

In use

In use.

Function

Pre-pour
Temporary securement device: positions and secures the utility before and during the concrete pour.
No rating
No load rating is published; the cured concrete carries the utility.

The cured concrete carries the utility.

Order

Order the part

Add parts to your list, then request a quote, a submittal package, or both. Pricing follows by reply.

Built to order

Height: 12, 18 or 24 in. (XX other)

Hole ID: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other); order a larger hole ID to pass couplings

Your part number

405A__B__

Finish the selections to complete the request.

From the data sheet

Notes

  • Slab-on-grade slick rod support with an integrated loop: secures the pipe prior to rebar.
  • Work safe: the installer secures pipes in place prior to rebar.
  • Galvanized rod; corrosion resistant.
  • Designed for demanding high-rise construction.
  • Integrated loop secures the pipe without extra ties, speeding up installation.
  • Electrical and plumbing: positions PVC conduit, PVC-coated GRC, ENT and PVC- jacketed MC (NEC 352.30, 344.30, 362.30, 330.30) and sleeved PEX (IPC 305, UPC 312.2) in the pour, secured so they cannot float, shift or separate at joints; spacing per the specifications and the manufacturer.
  • Drawings not to scale.