Your list (0)
430Slab-on-gradeElectrical and plumbing

Cast-in-Place Panel Cage

Panel cage for grouped runs: five channels carry pipe and conduit through the pour; customized to the project.

In use

In use.

Function

Pre-pour
Temporary securement device: positions and secures the utility before and during the concrete pour.
No rating
No load rating is published; the cured concrete carries the utility.

The cured concrete carries the utility.

Order

Order the part

Add parts to your list, then request a quote, a submittal package, or both. Pricing follows by reply.

Built to order

Height: 18 or 24 in. (XX other)

Channel ID, each of the five channels: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other)

Channel ID, each of the five channels: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other)

Channel ID, each of the five channels: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other)

Channel ID, each of the five channels: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other)

Channel ID, each of the five channels: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other)

Length, in.

Window, in.

Your part number

430A__B1__B2__B3__B4__B5__C__C1__

Finish the selections to complete the request.

From the data sheet

Notes

  • Panel cage for grouped runs: five channels carry pipe and conduit through the pour; customized to the project.
  • Work safe: the installer secures pipes in place prior to rebar.
  • Galvanized rod; corrosion resistant.
  • Designed for demanding high-rise construction.
  • The panel cage can be customized to the project; ask for what you need.
  • Electrical and plumbing: positions PVC conduit, PVC-coated GRC, ENT and PVC- jacketed MC (NEC 352.30, 344.30, 362.30, 330.30) and sleeved PEX (IPC 305, UPC 312.2) in the pour, secured so they cannot float, shift or separate at joints; spacing per the specifications and the manufacturer.
  • Drawings not to scale.